Compliance Score
+2% vs last quarter
87%
NFPA 70B
Overdue PMs
+2 since last week
7
requires action
Assets Tracked
stable
142
switchgear, gensets, transformers
Days to Audit
insurer review
23
insurer review
Critical Equipment Status
| Asset ID | Type | Last PM | Next PM | Status |
|---|---|---|---|---|
| SWG-A-001 | 480V Switchgear | 2026-04-12 | 2026-10-12 | Compliant |
| XFR-C-001 | 1500kVA Transformer | 2026-03-08 | 2026-09-08 | Compliant |
| GEN-01 | 2MW Diesel Genset | 2026-02-20 | 2026-05-20 | Due Soon |
| BKR-B-004 | 800A Breaker | 2025-11-14 | 2026-05-14 | Overdue |
| REL-A-002 | Protection Relay | 2026-04-01 | 2026-10-01 | Compliant |
| ATS-D-001 | Auto Transfer Switch | 2025-12-05 | 2026-06-05 | Due Soon |
| UPS-B-003 | UPS System | 2025-10-18 | 2026-04-18 | Overdue |
| MCC-A-002 | Motor Control Center | 2026-03-25 | 2026-09-25 | Compliant |
Recent Test Reports
View allNETA_SWG-A-001_2026-04-12.pdf
Insulation resistance: PASS, 1.2 GΩ. Thermography: PASS. No anomalies.
DOBLE_XFR-C-001_2026-03-08.pdf
Power factor: PASS, 0.42%. DGA: PASS. Oil condition: normal.
LOAD_GEN-01_2026-02-20.pdf
Load bank test: PASS at 100% rated. Runtime: 2h. Battery: PASS.
NETA_MCC-A-002_2026-03-25.pdf
Contact resistance: PASS. Insulation: PASS, 850 MΩ. Minor corrosion noted, non-critical.
Upcoming PMs
View scheduleMay 14
BKR-B-004
Trip/close cycle test + IR scan
KO
May 20
GEN-01
Monthly inspection + oil sample
TN
Jun 05
ATS-D-001
Transfer test + timing verification
RP
Jun 12
UPS-B-003
Battery impedance + capacity test
KO
Jun 28
SWG-B-003
Thermography + contact resistance
JM
Jul 08
XFR-C-002
Doble power factor + oil sample
RP
Audit Pack Status
Q2 2026 Audit Pack
78% complete
Due Jun 1, 2026
- Asset register
- Test reports indexed
- PM logs current
- Anomaly resolution log
AI Insights
Switchgear SWG-B-003 thermography trending hot — schedule IR scan within 30 days.
Genset GEN-02 last load bank test 14 months ago. NFPA 110 requires annual testing.
Transformer XFR-C-002 oil sample due — last Doble test 24 months ago.